- Show all
- Rehabilitation and maintenance
- Construction and stabilization of bases
- New pavements
- Soil movements
Máximo Tajes
New pavements Rehabilitation and maintenance
IMM Client Contract Cto 1997 Rehabilitation of Máximo Tajes street between Acosta and Lara and Eugenio Martínez Thedy Location Máximo Tajes and Ipanema Duration of the project 4 months
IM – LATE Old City II
Soil movements Rehabilitation and maintenance
Client IMM Contract LP P111918 Remodeling of Reconquista Street between Guaraní and Treinta y Tres Location Reconquista and Maciel Duration of the project 10 months
CONAFIN 1/23 – 21 of September
Construction and stabilization of bases Rehabilitation and maintenance
IMM customer – CND CONAFIN contract 01/23 AV Rehabilitation. 21 September between Blrv. Artigas and Rambla M Gandhi Location 21 September and Ellauri Duration of the project 10 months
CONAFIN 6/22 – Mendoza Road
New pavements Rehabilitation and maintenance
Customer: IMM – CND Contract: CONAFIN 06/22 AV Rehabilitation. Pedro de Mendoza from Tte. Rinaldi to Cno. Carlos A López Location: Of. Mendoza and Domingo Arena Duration of the project: 1
CONAFIN 3/22 – Luis Batlle Berres
New pavements Rehabilitation and maintenance
Customer: IMM – CND Contract: CONAFIN 03/22 AV Rehabilitation. Luis Batlle Berres from Cno. The Troops to Cno. Sand Pass. Location: Luis Batlle Berres and Cno. The Troops Duration
MARP – Viaduct
Construction and stabilization of bases Soil movements
Customer: ANP Contract: LPI N°21581 Construction of Viaduct 1,6 km long for Redefinition in the circulation of Rambla Portuaria Location: Rambla Porturia between Rio Branco and San Fructuoso
Grinor conditioned the new circuit of the El Pinar Autodrome
New pavements Rehabilitation and maintenance
Grinor was in charge of expanding and reconditioning the track at the El Pinar racetrack., executing improvements and renovation of the track with the highest quality standards, leaving
Work on the perimeter ring on the Route 102 and Cesar Mayo Gutiérrez, para CCFC.
Construction and stabilization of bases New pavements
It consists of the execution of approximately 42000 m<sup>2</sup> of concrete pavement as a tread, 46000 m<sup>2</sup> cemented base and 48000 m2 of granular ballast subbase.
Route Adequacy 91 in the town of Cebollatí
Construction and stabilization of bases New pavements
The work consists of the adaptation of the Route 91 (7 kilometers). This work involves the excavation of 25,000m3 of earth, then the surcharge of 98,000m3 of clay and 30,000m3 of granular material
Execution of Pavements in UPM Industrial Plant
Construction and stabilization of bases New pavements
They have consisted of the construction of 145.000 m2 of cemented granular base; construction of 145.000 m2 JPCP type concrete pavement; preparation of granular base for pavement
Paving the access to the Hospital de Clínicas
New pavements
The works consist of improving the infrastructure of Access to the Hospital on Avenida Italia, including drain reconditioning tasks, asphalt paving, sidewalks and signage
500kV extra high voltage station in Cardal
Soil movements
The work consists of leveling a platform of 116.560 m2 with excavation 58.280 m3 of topsoil. Later, an excavation is carried out 60.000 m3 of dismantling and 42.290 m3 the terraces
Paving the access to the port and connection roads to the Nueva Palmira bypass
Construction and stabilization of bases New pavements
Paving the access to the port and connection roads to the Nueva Palmira bypass
Contracts 1819 y 1889 – Mobile Patching Unit.
Rehabilitation and maintenance
Execution of minor patching with asphalt mixture in Montevideo. Equipped crews are made available to the client to carry out minor corrective maintenance on the Mon road network.
Controlled Milling
Use of milling machines equipped with hydraulic control systems that allow the milling drum to be positioned with millimeter precision following a previously designed three-dimensional project.
Conafin 1/2017 – Concrete patching works
Rehabilitation and maintenance
Conafin 1/2017 – Concrete patching works in streets: Cno. Carrasco (CC), Of. Bolivia (AB), Alfonso Lamas (AL) and Alejandro Gallinal (AG).
NATIONAL PUBLIC TENDER Nº135/18/03 – Infrastructure Works in “Pando Norte”
New pavements
NATIONAL PUBLIC TENDER Nº135/18/03 - Infrastructure Works in “Pando Norte
Conafin 1/2018: Reconstruction and widening of concrete pavement.
New pavements
Conafin 1/2018: “Reconstruction and widening of the concrete pavement of Susana Pintos streets between Camino Maldonado and Felipe Cardoso and Felipe Cardoso between Cochabamba and Susana Pintos. Customer:
Conafin (IM) 2-2018: Patching and asphalt overlaying of existing pavement.
Rehabilitation and maintenance
Conafin (IM) 2-2018: “Patching and asphalt overlaying of the existing pavement, the conditioning of existing trees that interfere with the works and vertical and horizontal signage. In: Ga
Conafin 2- 2018: Pavement patching and asphalt coating works.
Rehabilitation and maintenance
Execution of resurfacing with asphalt mixture on the streets and/or avenues covered by the Contract.
Contracts 1821, 1863, 1899 Maintenance Contracts with Asphalt Mixture in Montevideo.
Rehabilitation and maintenance
Execution of resurfacing with asphalt mixture in different areas of Montevideo.
Public Tender M 48: Repair and tune-up of Bridge in Barra de Santa Lucía.
Rehabilitation and maintenance
Partial reconstruction of metal structure, structural protection paint, renovation of joints and reinforcement of the board.
Repaving and widening of José Belloni Avenue between Perimeter Collector and Instructions Avenue
Construction and stabilization of bases New pavements
Repaving and widening of José Belloni Avenue between Perimeter Collector and Instructions Avenue
Conafin 2/2019 and Conafin 4/2018 – Construction of Av. Luis Alberto de Herrera between Mazzini Street and Monte Caseros Avenue
Construction and stabilization of bases New pavements
Construction of Av. Luis Alberto de Herrera between Mazzini Street and Monte Caseros Conafin Avenue 2/2019 and Conafin 4/2018
PPP Circuit 1, Route Paving 55 between Route 21 and Ombues of Lavalle
New pavements
PPP Circuit 1, Route Paving 55 between Route 21 and Ombues of Lavalle
Metropolitan Agri-Food Unit
Construction and stabilization of bases
Grinor was in charge of the internal roads of the UAM and the widening of the Luis Eduardo Pérez road from the Route 5 to Las Higueritas
Route Rehabilitation 5
Rehabilitation and maintenance
Route Rehabilitation 5 Rehabilitation and maintenance
Central Ferrocarril Work
Construction and stabilization of bases Soil movements
The work is included in the Section 3 Pk 104 – Pk 124, with a volume made up of more than 500.000 m3, executing soil movement tasks on the trace, execution of first layer of subs
Road and hydraulic infrastructure works in the cities of La Paz, The Stones, progress and 18 of may.
New pavements
The work is included in the cities of La Paz, The Stones, progress and 18 of May and involves the consolidation of its road and hydraulic infrastructure.
Works in the City of Canelones
New pavements
Improvement of the standard on the streets of the City of Canelones. The works are carried out in the Moreno and Borbonet and Parada Rodó neighborhoods of the City of Canelones.
Improvement of Access on the Port Rambla
Construction and stabilization of bases Soil movements New pavements
Construction of a Viaduct, an arch bridge, grade access ramps and intersections, fills and embankments in the Bay with the road infrastructure for access to the port
Road Corridor routes 21-24 –PPP-
Construction and stabilization of bases Rehabilitation and maintenance
The project includes the Nueva Palmira Bypass (length 8,5 km), Ruta 21 (section: Nueva Palmira-Route Nº2, length 79,5 km) and route 24 (section: ROUTE Nº2 – ROUTE Nº3, length 48 km)
Legislative Palace
Soil movements Rehabilitation and maintenance
Redesign and adaptation of the layout of Avenida de las Leyes, to improve traffic flow in the area.
New Center
Construction and stabilization of bases
Adaptation and widening of the Av. Luis Alberto de Herrera, for the correct management of traffic after the opening of the Nuevocentro Shopping
Cuenca Del Plata Terminal
Construction and stabilization of bases
1,280m² esplanade of the multipurpose port dock C
Ruta 12
Construction and stabilization of bases
22 km of resurfacing with a unique technology in Uruguay.
Machine – Municipal Administration of Montevideo
Rehabilitation and maintenance
Execution of concrete patching on Ramón Masini Street, between Pte. Oscar Diego Gestido and Bartolito Miter
IP City of the Coast
Construction and stabilization of bases
Execution and plani-altimetric redesign of the Ciudad de la Costa promenade
Of. Italy and Albo – IMM
Construction and stabilization of bases
Avenida Italia standard change, between Dr.. Manuel Albo y Av. Dr. Americo Ricaldoni
Wind Power Station 50 MW – Florida 2 (Akuo)
Construction and stabilization of bases
Execution of stabilized with Portland cement, of 17,960m² of roads at the Akuo Wind Farm, in the department of Florida.
Carrasco International Airport
New pavements Rehabilitation and maintenance
Commissioning of various paved areas within the Carrasco International Airport